PROJECT DETAIL
We have installed 3D Coal Bunker Level Measurement System at India’s biggest Governments Thermal power plant of Maharashtra State Electricity Generation Board at Chandrapur super thermal power plant. There we have installed 26 3d level sensors to unit no 5,6 and 7 of 500 MW. We installed the software at plant control room of respective units Ie 5, 6 ,7and coal handling plant control room to display bunker levels.
Complete 3D view inside the bunker
Total volume inside the bunker in percentage
Multiple point level measurement with accuracy
Minimum ,maximum and average level
Detects rat hole inside bunker
Generate historical report showing distance,volume,temp inside bunker
Gives the right information and helps to maintaining the coal level
Through LAN connectivity respective authorise person can observe the system easily
It helps to reduce the communication period and fast decision making